Photo Gallery

Final Inspection of Our New Engine "ADDITIONAL PHOTOS ADDED" - Appleton, WI
Monday, April 8, 2013

Officers and members of the Laurel Fire Department along with Brian Bashista from Atlantic Emergency Solutions traveled to Pierce Mfg. in Appleton, WI for the inspection of our new Engine. The Engine was thoroughly inspected going through the build specification that was designed by the Department. The Engine will be brought to Atlantic Emergency Solutions in Middletown, DE where the Engine will have a complete PMI inspection and then delivered to Laurel later in the week. We look forward to placing the unit into service in May 2013. The Engine is a 2013 Pierce Arrow XT with 750 gallons of water and Class “A” and “B” foam systems. The unit features a 1500 GPM pump and sports a FDNY Style low hose bed to allow firefighters to deploy attack lines without climbing on the apparatus. The front bumper was also designed to allow firefighters to quikly deploy our “Kentland style” hose packs that we have had in service since 2001. The Engine will carry 5” and 3” supply lines along with a 2-1/2” blitz line off the rear. Engine 81-4 replaces a 1994 Pierce Saber Engine that served as our front-line Engine until 1996 in town and has been running as the primary Engine in our Sycamore substation. Our old Engine 4 has been sold to New Church, VA Fire Department.


Views: 353

Views: 333

Views: 313

Views: 294

Views: 305

Views: 334

Views: 308

Views: 329

Views: 306

Views: 282

Views: 278

Views: 295

Views: 222

Views: 208

Views: 212

Views: 207

Views: 200

Views: 204

Views: 195

Views: 194

Views: 192

Views: 202

Views: 199

Views: 194

Views: 201

Views: 198

Views: 201

Views: 196

Views: 189

Views: 192

Views: 194

Views: 192

Views: 200

Views: 197

Views: 198

Views: 191

Views: 191

Views: 192

Views: 191

Views: 184

Views: 186

Views: 187

Views: 191

Views: 192

Views: 185

Views: 177

Views: 164

  Photo of the Day

  Event Calendar


There are currently no events posted


Hall Rental